Furtado & Associates, Inc.
  • Furtado & Associates
    • About Us
    • Our Vision
    • Leadership Team
  • Services
    • Land Survey
    • Right of Way Engineering
    • Construction Management
    • 3d LiDAR
    • Drone Photogrammetry
  • Portfolio
    • Tukwila Sounder
    • Yesler Bridge
    • First Hill Street Car
    • King Co. Foothills Trail
    • Sammamish Park & Ride
    • Lakewood to Tacoma
    • Georgetown CSO
    • Freighthouse Square
    • Sound Transit Light Rail
  • Contact Us
    • Contact Us
    • Careers
  • Furtado & Associates
    • About Us
    • Our Vision
    • Leadership Team
  • Services
    • Land Survey
    • Right of Way Engineering
    • Construction Management
    • 3d LiDAR
    • Drone Photogrammetry
  • Portfolio
    • Tukwila Sounder
    • Yesler Bridge
    • First Hill Street Car
    • King Co. Foothills Trail
    • Sammamish Park & Ride
    • Lakewood to Tacoma
    • Georgetown CSO
    • Freighthouse Square
    • Sound Transit Light Rail
  • Contact Us
    • Contact Us
    • Careers
Picture

WSDOT Freighthouse Square


​This existing Freighthouse Square building is part of the architectural/engineering duties for WSDOT's High speed Intercity Passenger Rail Project-Point Defiance Bypass.  The existing Tacoma Amtrak Station will be relocated within a portion of the Freighthouse Square building, which will be adjacent to the Point Defiance Bypass Alignment. 
​
Furtado & Associates (as L&A at the time) provided detailed topographic and utility base mapping within project limits. Surveying included cross-sections at 50-foot intervals with ground shot intervals as well as utility potholes.  Base maps included topographic features and elevations within the work vicinity, providing sufficient detail for the design of underground and overhead facilities in addition to surface features and above ground items.
Picture
Picture
Copyright 2022 Furtado & Associates